Product Description
ELECTRICAL DATA(STC)
Module |
SPxxxM-72H xxx = Peak Power Watts |
Peak Power Watts(Pmax/W) |
390 |
395 |
400 |
405 |
410 |
415 |
Power Output Tolerance(W) |
0 ~ +5 |
Maximum Power Voltage(Vmp/V) |
40.2 |
40.5 |
40.8 |
41.1 |
41.4 |
41.7 |
Maximum Power Current(Imp/A) |
9.71 |
9.76 |
9.81 |
9.86 |
9.91 |
9.96 |
Open Circuit Voltage(Voc/V) |
48.5 |
48.7 |
48.9 |
49.1 |
49.3 |
49.5 |
Short Circuit Current(Isc/A) |
10.25 |
10.29 |
10.33 |
10.37 |
10.41 |
10.45 |
Module Efficiency(%) |
19.2 |
19.4 |
19.7 |
19.9 |
20.2 |
20.4 |
STC:Irradiance 1000W/m2,Cell Temperature 25°C,Air Mass AM1.5.
*Measuring Tolerance: ±3%.
ELECTRICAL DATA(NOCT)
Module |
SPxxxM-72H xxx = Peak Power Watts |
Peak Power Watts(Pmax/W) |
294 |
298 |
302 |
305 |
309 |
313 |
Maximum Power Voltage(Vmp/V) |
37.7 |
38.0 |
38.2 |
38.5 |
38.8 |
39.0 |
Maximum Power Current(Imp/A) |
7.81 |
7.85 |
7.89 |
7.92 |
7.97 |
8.01 |
Open Circuit Voltage(Voc/V) |
45.6 |
45.8 |
46.0 |
46.2 |
46.4 |
46.6 |
Short Circuit Current(Isc/A) |
8.27 |
8.30 |
8.33 |
8.36 |
8.39 |
8.43 |
NOCT:Irradiance 800W/m2,Ambient Temperature 20°C,Wind Speed 1m/s.
Our Factory
Professional Packing
Model |
SPxxxM-72H |
Modules per box |
30 pieces |
Modules per 40' container |
660 pieces |
Note: The Above packing information contained in this web is subject to change without notice.
We will offer wooden box packing with extra material and labor costs if your order less than a pallet,
we accept any customized packing as per your requests.
Grade A Material
Project Cases
FAQ
Q1: Are you a factory or a trading company?
A: We are a professional Solar Panels Manufacturer in China
Q2: How can we guarantee the products quality?
A: Always provide the esteemed buyer a pre-production sample before mass production; Always testing every product before despatching the shipments.
Q3: Can you support OEM and field installation?
A: Yes, as a professional solar system manufacturer, we can provide customers with OEM and on-site installation, full support and assistance services.
Q4: What about the lead time?
A: Sample needs 5-10 days, mass production time needs 3-5 weeks, it depends on order quantity.